Reimagining a former church into a vibrant interiors destination

Knockbain Church

240709 Sketch View2

Client

Interior35

Progress

Complete

The brief set out to create a destination for exemplar interior design.

3209 N11

The background

The reimagination of the former Knockbain Munlochy Parish Church in the Scottish Highlands, as a vibrant interior design destination, combines studio, retail, and café space, all while preserving the building’s character and maintaining its role at the heart of the local community.

The church is a notable example of Free Church of Scotland architecture, distinguished by its Gothic detailing and strong spatial hierarchy. Following its de-consecration, the building has been repurposed through close collaboration with the client, to deliver on their ambitions with architectural integrity. The approach prioritises minimum external intervention, ensuring the historic envelope remains largely unchanged while delivering a new interiors emporium with external landscaping and parking.

3209 N13
Interior35 Kirkin Progress 0041
Interior35 Kirkin Progress 0008

The design approach

The Church featured a highly raked interior, designed to draw focus to the pulpit. As the first principle of design, the approach sought to convert this into usable, contemporary space while respecting the original structure and sight lines through the careful introduction of level platforms.

At gallery level, a new floor plane sits above the stepped seating, defined by a transparent balustrade to preserve spatial and visual continuity. A strategically inserted bridge links the opposing sides and resolves circulation inefficiencies, creating a safe and intuitive route around the new gallery and showroom space. 

3209 N21
3209 N10

Sustainability is embedded through retention and adaptive reuse, including the recycling of the original pews.

Interior35 Kirkin Progress 0067
Interior35 Kirkin Progress 0075

A key architectural gesture is the insertion of a glazed, insulated studio pod within the former pulpit zone. This contemporary addition provides a controlled working environment for the owners, without compromising the thermal performance of the historic fabric. It visually connects work in progress with the wider visitor experience.

3209 N23
3209 N6
3209 N26
3209 N15

The completed scheme delivers a cohesive, accessible, and commercially viable space that honours the building’s heritage.

3209 N4
3209 N7

Photography

Catriona Parmenter Photography

Catriona Hill Partner Civic Community Arts lead North lead

If you want to know more about our work in this sector, contact Catriona our sector lead.

Email Catriona

Related Projects